top of page

Projects

Tablet Press

 

 

Upgrade of an old manual tablet press system with a new PLC controlled system. Upgrades also include new dust collection system.

Loading Dock

 

 

Replace deteriorated loading dock pad.

SME Consulting

 

 

Several maintenance and reliability failures. (Exchanger leaks, gasket failure, pump seal failure, weld failures, refractory lining failure, corrosion concern, etc. 

bottom of page